Mechanical Contracting and Fabrication Case Study Banner

Case Studies

Metro Health Hospital
Ahead of Schedule at a Lower Cost with 3-D Coordination

See how 3-D coordination ensured smooth construction of Metro Health's new Central Utility Plant. Learn more.

Amway Grand Plaza Hotel
Energy and Money Saved with Design-Build

Over $100,000 in savings annually was achieved after design-build upgrades. Find out how it was done.

Metro Health Logo Amway Grand Plaza Hotel Logo